Skip to main content

Reimbursement · September 5, 2026 · Updated November 7, 2026 · 6 min read

Medical Device Reimbursement in Germany

Germany is the largest MedTech market in Europe and one of the slowest to pay for something new. The route depends on where the device is used.

Key takeaways

  • Inpatient devices can be used from day one inside a DRG; the question is whether the DRG covers your price.
  • The NUB window closes 31 October each year. Miss it and the first supplement is fourteen months away.
  • Outpatient devices wait for a G-BA decision unless they qualify as a DiGA (around 60 listed).
  • The hospital reform (KHAG, in force 15 April 2026) means fewer sites per service group and more procedures priced as Hybrid-DRGs.

Germany is where most non-European MedTech companies want to start, and where most of them lose a year. The market is large, the clinical community is influential, and the reimbursement system is rigorous in a way that punishes anyone who arrives with a US playbook. This primer covers the three routes that matter for a device and what each one means for your timeline.

Who pays

Around ninety percent of the population is covered by statutory health insurance, the GKV, delivered through 93 sickness funds. The remaining ten percent hold private insurance, the PKV, which reimburses more generously and more quickly but is too small to build a European business on. Plan for GKV. Treat PKV as early revenue and a source of clinical champions.

The rules for what GKV pays for are set by the Federal Joint Committee, the G-BA. Tariffs are calculated by the Institute for the Hospital Remuneration System, InEK, for inpatient care and by the National Association of Statutory Health Insurance Physicians, the KBV, for outpatient care. Those three names will appear in every reimbursement conversation you have.

Route one: inpatient, through the DRG system

If your device is used during a hospital stay, it is paid for inside a diagnosis-related group, the aG-DRG. The hospital receives a flat sum for the episode and buys your product out of it. Two consequences follow.

First, a new device that fits an existing DRG can be used from day one. German hospitals may use a new method unless the G-BA has excluded it, which is the opposite of the outpatient rule. One exception: a new method built on a class IIb or III invasive device that is filed as a NUB triggers a G-BA benefit assessment under section 137h, so high-risk inpatient devices are not fully "day one" either.

Second, if your device raises the cost of the episode above what the DRG pays, the hospital loses money on every case. The fix is the NUB application, for new examination and treatment methods. A hospital, not the manufacturer, applies to InEK each fall. A status one decision allows the hospital to negotiate a supplementary payment with the sickness funds for the following year. The window closes 31 October, so a product that arrives in November waits fourteen months for its first chance.

The hospital reform changes this route. The KHVVG (passed December 2024, in force 2025) and its amendment, the KHAG (in force 15 April 2026), assign hospitals to 61 service groups, with the Länder allocating sites by end 2026 or 30 September 2027 at the latest. About 60 percent of former DRG revenue moves into fixed Vorhaltepauschalen, budget-neutral in 2026 and 2027, converging in 2028 and 2029. In parallel, 69 Hybrid-DRGs covering 904 procedure codes pay the same flat fee whether the procedure is done in hospital or in a practice. For a device company this means fewer, larger hospital accounts per indication, and more procedures where the device cost sits inside a cross-sector flat fee with no NUB route.

So what: identify the DRG or Hybrid-DRG your product lands in, and its margin, before you sign a distributor.

Route two: outpatient, through the EBM

Devices used in an outpatient practice are paid through the uniform evaluation standard, the EBM, and here the rule reverses. A new method may not be billed to GKV until the G-BA has assessed it and issued a positive decision, which normally requires evidence of benefit from controlled trials. The assessment takes years, and the G-BA can commission a trial of its own if the evidence is insufficient.

There is a route around the wait for digital products. The 2019 Digital Healthcare Act created the DiGA fast track. A DiGA that passes the Federal Institute for Drugs and Medical Devices, BfArM, is reimbursed provisionally for twelve months, extendable to twenty-four, while it collects evidence. Since 2020, more than 70 apps have entered the directory; around 60 are listed, most of them permanently. Class IIb devices have been eligible since 2024, but only for permanent listing with the evidence in hand; the provisional route stays with class I and IIa. Prices are negotiated with the GKV-Spitzenverband, and outcome evidence is now required for continued listing.

So what: if your device is outpatient and not digital, Germany is probably not your first market. Build revenue and evidence in a tender-driven market and come back with the data the G-BA wants.

Route three: medical aids, through the Hilfsmittelverzeichnis

Products used by the patient at home, from incontinence products to continuous glucose monitors, are reimbursed as medical aids. Listing in the medical aids directory, the Hilfsmittelverzeichnis, run by the GKV-Spitzenverband, is the practical prerequisite. Listing requires proof of quality and usability and takes months rather than years. Prices are then set by contracts with individual sickness funds, often by tender.

Procurement is the other half

Reimbursement gets you paid. Procurement gets you bought. German hospitals purchase through group purchasing organizations that negotiate on behalf of hundreds of sites. A framework agreement with two of the large ones is worth more than fifty individual hospital contracts, and it takes a local presence to win one.

A realistic timeline: an inpatient device that fits an existing DRG reaches first orders in three to six months through a distributor, with a NUB program running in parallel if the economics need it. One that does not fit needs twelve to eighteen months to a negotiated supplement, with two to five reference hospitals doing the filing. An outpatient device faces a multi-year G-BA process unless the DiGA route applies. A medical aid takes six to twelve months to listing and first fund contracts.

What we do with this

In an Enter Europe assessment we place your product on this map in week one, with the actual DRG or Hybrid-DRG, the NUB history for comparable products, and the group purchasing organizations that matter for your category. That decides whether Germany is market one, market three, or market never. Related: Who pays for an AI device in Europe and the Enter Europe door.

Facts and dates

  • 93 statutory sickness funds as of 1 January 2026: GKV-Spitzenverband, checked 2026-11-07.
  • NUB application deadline 31 October, status 1 permits negotiation: InEK NUB procedure, checked 2026-11-07.
  • Section 137h assessment for new high-risk methods: § 137h SGB V, checked 2026-11-07.
  • KHAG promulgated in BGBl. 2026 I Nr. 98 on 14 April 2026, in force the following day; service groups reduced from 65 to 61: Bundesgesetzblatt and AOK summary, checked 2026-11-07.
  • Vorhaltevergütung about 60 percent of DRG revenue; budget-neutral 2026 and 2027, convergence 2028 and 2029: AOK Vorhaltekostenfinanzierung and DKG, das Krankenhaus 9/2026, checked 2026-11-07.
  • 69 Hybrid-DRGs with 904 OPS codes for 2026: KBV, 13 November 2025, checked 2026-11-07.
  • DiGA: 74 entered since 2020, 58 live at end 2025 (48 permanent, 10 provisional), class IIb eligible since 2024 for permanent listing: Bitkom DiGA-Bericht 2026, checked 2026-11-07.

This primer reflects the rules as we understand them in November 2026. Tariffs and procedures change annually. It is not legal or regulatory advice.